Find out what your factory could deliver and what's stopping it.

Your Factory's Stuck,

Nothing Moves the Needle,

And You're Not Sure What The 

Next Move Should Be

Manufacturing 1076 500

An independent, hands-on review of your manufacturing operation to identify what's limiting output, increasing lead times and making production harder to manage.

Led personally by Mark Greenhouse, an experienced Manufacturing and Operations Director, we examine your whole Manufacturing Process Cycle — from customer enquiry and planning through to production and dispatch — to uncover what's really causing the problems.

You won't just receive another report telling you what you already know.

You'll get a practical Diagnostic Report and Action Plan showing what to fix first, how much improvement may be possible and how to make it happen.

And the help doesn't have to stop there. Levantar can work alongside your managers and teams to implement the improvements, develop their skills and deliver measurable results.

Start with a free introductory conversation.

Missing delivery dates?

Orders are running late, you, sales & customers are becoming frustrated.

Firefighting every day?

Managers, at all levels are chasing problems rather than controlling production.

Running short of capacity?

Everyone is busy, overtime isn't helping, output isn't keeping up with demand.

Not sure what to fix first?

You've tried improvements, but nothing sticks, the underlying problems remain.

You've tried faster machines, more people, new software or improvement programmes.

Before trying another solution, find out what's actually limiting your factory's performance.


Most improvement fails because this step gets skipped 

When the real constraint isn’t clear, you get:

  • opinions instead of evidence

  • activity instead of impact

  • priorities that swing daily

  • “Lean” that becomes tools without traction

Clarity before action. Evidence before opinion. Understanding before fixing.

That’s what the Diagnostic Review is for.

I’m Mark — and I help manufacturers find what’s really holding performance back

My role isn’t to sell you a programme or drown you in jargon. It’s to help you see the factory as it really is — what’s restricting flow, why previous fixes haven’t stuck, and what would make the biggest difference next.

No blame.  Just clear insight and usable next steps.

I've been in and around manufacturing for over 30 years, in a wide range of industries and roles. You can read about my manufacturing background.

What happens after the review (only if needed)

Sometimes the right next step is Lean work. Sometimes it’s leadership coaching. Sometimes it needs interim support. Sometimes it’s simply stopping the wrong work and protecting flow.

The Diagnostic Review is the gateway clarity first, then the appropriate follow-on if required.

Follow-on options (links):

What You'll Receive From Your Factory Performance Review

Not another report telling you what you already know. A practical assessment of what needs changing and how to make it happen.

Your Factory Performance Diagnostic Report & Action Plan gives you four things:

 

1. Understand What's Holding Your Factory Back

An independent assessment of your factory's performance, identifying the underlying causes of lost output, long lead times and delivery problems.

Includes an explanation of your Operating Model and improvement insights from across your Manufacturing Process Cycle.

 

2. Know How Much Improvement Is Possible

An evidence-based estimate of the additional output and capacity your factory could achieve, where the available information supports it.

Understand where time, capacity and money are being lost and what recovering them could mean for your business.

 

3. Know What to Fix First

A prioritised 12-week Action Plan, identifying the improvements that should make the biggest difference first.

Practical actions your managers can begin implementing, rather than another long list of recommendations.

 

4. Know What Comes Next

A longer-term improvement roadmap identifying typically 4–8 improvement projects to strengthen factory performance over the next one to two years.

Projects are prioritised by their potential business impact, helping you improve systematically rather than launching everything at once.

A low-risk first step

This is designed to reduce risk, not create it.

  • You’ll get findings that are usable with or without continuing to work together

  • The purpose is clarity and confident decisions, not commitment to a long programme

 

Who the Diagnostic Review is for

This is a fit for Owners, MDs, Manufacturing Leaders who

  • feel that their management is plateauing and isn't able to step up
  • have tried lots of "tools" but nothing has delivered
  • want to confidently deliver plans for the business, for customers
  • can see growth in their market but aren't sure how to deliver it

Not sure if it’s right? That’s normal. A short conversation is the safest first step.

Factory Performance Diagnostic Review Action Plan Levantar

Your Factory. Your Report. Your Action Plan.

This isn't a standard checklist applied to every factory.

Your report and insights are built around your manufacturing processes, operating model and performance challenges.

It identifies the improvement opportunities and sets out a practical sequence for addressing them. A sequence that can be delivered with hands-on support.

How the Review Actually Works. What I Do On Site

The Factory Review + Action Plan is delivered in 5 Stages.

  1. Free Conversation - on Teams for you to ask questions, share the challenges and frustrations, confidentially and for FREE. (some call it the therapy session)
  2. Preparation and Data Insights - you share operational information and data that help us to understand the business before we arrive.
  3. Factory Visit - to see how your manufacturing works hour by hour and why. 
  4. Diagnostic Review + Action Plan - delivered to you and your team. It describes your Operational Model, the Manufacturing Cycle and the potential free capacity in your business. 
  5. Diagnostic Review + Action Plan - reviewed and we discuss the next steps, the urgent ones and the longer term projects.  

Factory Performance Diagnostic Review 5 Steps Levantar

A report is only valuable when something changes, when you use it.

You'll have a practical plan your team can implement, and if you need hands-on help, Mark can work alongside your managers to make the improvements happen.

I’m Mark.   I help manufacturers like you uncover what’s really holding the factory back and build a step-by-step plan to move forward confidently, quickly.

We uncover the issues during a Factory Performance Diagnostic Review.

In the Review I use observations and interviews to produce a bespoke, unique report that contains THE plan to get you moving.

Pricing of the Factory Review, What's Included.

The Factory Diagnostic Performance Review comes with a guarantee.

  • £2,995 + VAT - one site, t/o less than £5M. More sites? Higher T/O? call or email for details.
  • The Intro Call is ALWAYS FREE.
  • Money Back Guarantee - if we don't find improvements worth £2,995, you get your money back
  • Your Management Team Aligned

You Get

  • A clear ACTION PLAN - what to do, in what order to maximise your output
  • A confident team
  • A plan to solve the challenges.   A plan that isn't just technical, it looks across the whole Manufacturing Cycle from Enquiries to Dispatch. It reviews the Processes, the Information, the Costing and Who is Responsible.
  • A guide who has travelled this path, in manufacturing firms. Holding roles from Supervisor, through to Operations Director. Managing everyday operations, Mon -Fri, as well as 24/7.  Overseeing Capex projects and Improvement teams.
Levantar Factory Performance Diagnostic Review Video May 25

LinkedIn - Manufacturing Insights, Tip and Stories

Most Days I Share Insight, Tips and Stories About Manufacturing On Linkedin.  The Latest Posts To My Feed are Shown Below.

If you want to connect on Linkedin either search for my name OR click the link here Mark Greenhouse Linkedin Profile. 


The Factory Diagnostic Performance Review & Report is for Manufacturing Owners, Senior Manufacturing Leaders and FDs who:

  • Want growth but keep getting stuck by factory inefficiency
  • Know there’s potential - but not what to fix first
  • Are tired of surface-level fixes that promise but don’t last
  • Want clarity, a roadmap, and confident managers.

Not sure if it’s right for you? Let’s talk. No pressure, no jargon.

Book Your Free Intro Call and Find Out...

    You Don’t Have To Carry On Alone Anymore. 

    Lets Take The Weight Off Your Shoulders. 

    Fill in the Contact Form. We’ll Get In Touch To Arrange Your Free Intro Call.

    Or Contact Mark on 07712 669396 or on mark@levantar.co.uk.

    Clarity. Confidence. Control Of Your Factory Again.

    Fill In The Form And We Can Arrange the FREE Conversation and You’ll Get A PDF Document Detailing the Process.

     

     

    Book Your Manufacturing Review Today!

      Levantar Factory Diagnostic

      Levantar Factory Diagnostic Review Document

      Where Do You Cover With The Factory Performance Reviews

      I cover the UK. Based in York I conduct Factory Performance Reviews all over the UK. From Southampton to Aberdeen, Newquay to Hull.

      Which Manufacturing Sectors Does The Factory Performance Review Cover

      I've have a breadth of experience working with organisations across all Manufacturing types from Chilled Foods to Heavy Engineering, from Drinks Production Lines to Electrical Assembly Units, from fabricating Farm Equipment to Plastic Moulding.

      We Have 2 or More Sites, How Does It Work For Them?

      Call Me. I have conducted reviews in organisations with 3+ sites. Lets have a chat to see if the Factory Performance Review is right for you. If it is then we can talk about how we do it and the investment. The reality is it just takes a bit of planning.

      What Is The Plan We Get?

      The Factory Performance Review aims to identify improvements and the projects to make these become reality. The plan you get lists these projects. In the order they should be delivered to improve the business and give you the maximum return. Typically we aim for 1 per Quarter. You have a lot of other things to do in the factory other than improvement.

      Ready For A Factory Performance Review?

      Ready to discover the projects that will take your business forward?

      Ready to discover which projects you should do first to deliver improved performance?

      Book a Call today, it's free to start.. Fill in the form below or Call Mark on 07712 669396 or email mark@levantar.co.uk